Investment of Project on road from Tan Minh to Son My

 

 

 

(binhthuan.gov.vn) The project on road from Tan Minh to Son My, Ham Tan district is approved by the Provincial People's Council at Resolution No. 17/NQ-HDND dated 17/7/2022. This is the route connecting National Highway 1 with National Highway 55, the axis connecting the North-South Expressway, National Highway 1A, National Highway 55 and Son My International Port in the future; contributing to shorten the distance and time for transporting goods and traveling between the national longitudinal axes through the area; step by step perfecting the regional infrastructure; ensuring national security.

 

Currently, the state of the road from Tan Minh to Son My has an 8.0m wide road surface, with hot asphalt concrete structure; the left side of the route has no longitudinal groove, the right side of the route has built a longitudinal groove; at Km67+105 there is a horizontal sewer; plain grade IV road, clear vision; the road is operated on a scale of 02 lanes, located outside the densely populated areas. The distance to the connection points to Ba Ria Vung Tau direction is 2.325 km; to Lam Dong is 1.101 km.

 

In order to facilitate the project implementation, serving the needs of the people, and contributing to the socio-economic development of the locality, the Department of Transport has proposed the Provincial People's Committee to request the Ministry of Transport and the Vietnam Road Administration to consider and invest in locations connecting the road from Tan Minh to Son My, Ham Tan district to National Highway 55.

 

 

Nguyễn Phương

Total Access Statistics
  • Đang truy cập: 1
  • Hôm nay: 1
  • Trong tuần: 1
  • Tháng hiện tại: 1
  • Tổng lượt truy cập: 1
Đăng nhập